JSC «GT Morstroy»
as of 30.01.2018
List of design and survey activities on the Russian territory carried out
by JSС «Morstroy»
Select the status of construction:
Status of construction:
select turnover
up 10 million/t
from 10 to 20 million/t
over 20 million/t
prospective
are begin designed
under construction
constructed
Object
Design stage*
Status of con-struction / op-eration
№
п/п
Client
Facilities
Technical indices
Design car-go turnover,
million tons/year
Oil, gas and oil products transshipment complexes
1
LLC TsUP VSTO,
OJSC «AK Transneft»
Specialized oil seaport «Kozmino». The first stage of a pipeline system «Eastern Siberia — the Pacific ocean»
DDD,
DS
Marine facilities of the port
1 Phase Constructed
in 2009
Full development
in 2012
15,0 — first stage,
30,0 — completely developed
OJSC «Taganrogsky sudoremontny zavod»
2
Taganrogsky shipyard. Oil products transshipment complex
Hydrotechnical facilities of the complex
DDD,
DS
Constructed
in 2006
0,5
3
OJSC «Lukoil-Severozapad-nefteproduct»
Vysotsk port. Oil production distribution and transshipment complex LUKOIL-II
DDD,
DS
Hydrotechnical facilities of the complex
Constructed
in 2004
10,5
4
LLC «NT Belokamenka»
Offshore oil transshipment complex near the village of Belokamenka in the waters of Kola Bay
Offshore anchorage of storage tanker
DOI,
DDD,
DS
Constructed
in 2004
12,0
5
CJSC «PNT»
St-Petersburg seaport.
St.Peterburg oil terminal
DDD,
DS
Hydrotechnical facilities of berths No. 1, 2, 3, 4, 112, 112-а
Constructed
in 1998–2003
15,3
LLC «Murmanskoy morskoye parokhodstvo»
6
Offshore oil transshipment complex at the inner roadstead of Kola Bay, further south than Mishukov Cape
Offshore anchorage of carrier-tanker
DOI,
DDD,
DS
Constructed
in 2003
5,0
7
MPA St-Petersburg,
LLC «Arktur»,
OLGI TRADE TRANSPORT & CONSTRUCTION AG, CJSC «PNT»
Oil products offshore transshipment complexes in the Gulf of Finland waters
DOI,
РП,
DS
Offshore quays for oil products handling on the waters of anchorage No. 5а, on the crossing of navigable channel No. 16а and St-Petersburg sea channel.
Constructed
in 1998–2003
5,2
LLC «Sibur-Portenergo»
Ust-Luga commercial seaport. LPG transshipment complex
Offshore and onshore complex facilities
8
DOI,
PD,
DDD,
DS
Constructed
in 2013
4,0
Russian bulk oil complex «Vistino» in Ust-Luga port
9
LLC «Severo-Zapadny Alians»
DOI,
PD
Offshore and onshore complex facilities
According to Client’s plans
10,0–18,0
Multiconsult Shtokman Development AG
10
Port transport and technological complex of integrated development of Shtokman gas condensate field, phase 1
Offshore complex facilities
FEED
According to Client’s plans
7,5
Port transport and technological complex of integrated development of Shtokman gas condensate field, phase 1
11
Multiconsult Shtokman Development AG
Site preparation for onshore objects construction
PD
According to Client’s plans
10,0–18,0
CJSC «NIPI InzhGeo»
Pipeline system «Eastern Siberia— the Pacific Ocean». Bulk oil terminal in Perevoznaya Bay
Terminal marine facilities
12
DDD
Relocated
to Kozmina bay
80,0
Specialized oil seaport «Kozmino». First stage of pipeline system «Eastern Siberia —the Pacific Ocean»
PD
13
LLC TSUP VSTO,
OJSC «AK Transneft»
Options of the single mooring point, type CALM
Fixed berths option accepted
30,0
LLC «Neste St-Petersburg»
St-Petersburg sea port. Marine cargo district Bronka. Oil products transshipment terminal
14
Marine facilities
DOI
Converted into Ro-Ro terminal
2,4
Temporary offshore transshipment complex in the waters of the middle knee of Kola Bay between Cape Tuhmachkin and Cape Krasnoscel’e
15
LLC «RPK-Nord»
Temporary offshore transshipment complex of storage tanker «Umba»
DOI,
PD,
DDD,
DS
Constructed
in 2015
12,0
LLC «Gazprom proektirovanie»,
LLC «NIPI NG «Peton»
Complex for the production, storage and offloading of liquefied natural gas in the vicinity of the compressor station «Portovaya»
Marine facilities
16
DOI,
IS,
PD,
DDD,
DS
Under con-struction since 2017
1,5
17
Seaport in the district of Sabetta settlement on the Yamal Peninsula. Main facilities of the seaport
OJSC «Yamal LNG», OJSC «MRTS»
Foundation of the technological trestle. Shore protection, networks and roads of the South-Eastern ice barrier facility
PD,
DDD,
DS
Constructed
in 2017
16,5
LLC «Gazprominvest»
Terminal for the reception, storage and regasification of LNG in Kaliningrad region
Protective structure
18
DOI,
IS,
DDD
Under con-struction since
с 2016
2
Temporary offshore transshipment complex in the waters of Murmansk port in the area of Cape Filinski
19
LLC «LK Volga»
Temporary offshore transshipment complex for «Kola» storage tanker
DOI,
PD,
DDD,
DS
Constructed
в 2017
12,0
Total:
Oil, gas and oil products transshipment complexes have been designed
Of which:
Constructed
Under construction
Prospective
19
11
2
6
General, bulk and universal cargo transshipment complexes
North European gas pipeline «Russia—Germany» (Nord stream)
20
LLC «Gazprom invest Zapad»,
OJSC «Giprospetsgaz»
Handling quays for heavy-weight and construction cargoes «Portovaya»
DDD,
DS
Constructed
in 2010
0,5
OJSC «Kompania Ust-Luga»
Ust-Luga Commercial seaport. Multipurpose transshipment complex «Yug-2»
Offshore and onshore complex facilities
21
PD,
DDD
First Phase constructed
in 2008
4,8
Football stadium in the western part of Krestovsky Island, St-Petersburg (Kirovsky stadium)
PD,
DDD,
DS
Constructed
in 2008
22
LLC «Avant»
Construction quay
0,5
LLC «PO Kirishinefteorgsintez»
Chernaya river, Leningrad region
LLC «KINEF» handling point of large-capacity equipment
23
DDD
Constructed
in 2005
0,5
Taganrogky shipyard. Grain terminal
24
OJSC «Taganrogsky sudoremontny zavod»
Ship repairing quay — big repairs
DDD
Constructed
in 2002–2005
2,0
OJSC «Taganrogsky su-doremontny zavod»
Azov. Grain terminal
Berthing facilities of grain terminal
25
DDD
Constructed
in 2003
0,7
Murmansk. Coal terminal at the quay No. 4
26
OJSC «Murmansky morskoy torgovy port»
Additional equipment of the quay for accepting «Panamaks» type ships
DDD
Constructed
in 2003
2,0
MPA «Eysky morskoy port»,
OJSC «Eysky MTP», MA of Eyskoye shipping company, LLC «Direktoria-NMP»
Eysk sea port
Bank slopes,
berth, quay No. 2 — big repairs
27
DDD
Constructed
in 1999–2002
4,0
St-Petersburg sea port. Baltic bulk terminal
28
St-Petersburg MPA
Berth No. 107 in the coal terminal
FS,
DDD, DS
Constructed
in 2002
5,0
CJSC «Kronimeksport»
Kronshtadt. Transshipment complex for general and refrigerated cargoes
Offshore and onshore complex facilities
29
DOI,
PD
According to Client’s plans
2,3
Grain terminal of complex «Taman»
30
LLC «Feeding ingredients»
Cargo quays No. 3 and No. 4
DDD
Constructed
in 2011
5,5
LLC «NPF «GT Inspect»
Shipbuild plant «Red barricades»,
Ikryansky region, Astrahan
Assembly site with specialized waterfront
31
PD
Constructed
in 2015
0,1
Handling terminal,
Murmansk, Kola Bay
32
OJSC «MMC «Norilsk nickel»
Repair of quay No. 1 and reconstruction of quay No. 2
PD,
DS
1, 2, 8 Phases constructed
in 2011,
4, 5, 9 Phases constructed
in 2014
1,5
SC «Yamal LNG»,
LLC «MRTS Engineering»
Sea port in the district of Sabetta settlement on the Yamal Peninsula, including the creation of the navigable approach channel in the Gulf of Ob
The objects of the preparatory period. Berths and onshore facilities
33
DOI,
PD,
DDD,
DS
Quays 1, 2, 3, 4
constructed
in 2015
2,5
Saint-Petersburg Seaport. The third district of the seaport. litera BF, road to Turukhtannye Islands
34
The FSUE «Rosmorport»
Saint Petersburg branch
Berthing complex for icebreakers moorage
FEED,
PD,
DDD,
DS
Constructed
in 2015 г.
―
SC «Yamal LNG»,
LLC «ZapSibGidrostroy»
Sea port of Sabetta on the Yamal Peninsula. Objects of the preparatory period
Quays No. 5 and No. 6
35
PD,
DDD,
DS
Constructed
in 2016 г.
1,0
(60 modules
per year)
Development of transport hub «Vostochny-Nakhodka»
(Primorsky Krai)
36
FTI «Rostrans-modernization»
Universal production and transshipment complex «North». Marine part
PD
Under construction since
с 2015 г.
Phase 1 – 14,0;
full development – 20,0
Total:
General, bulk and universal cargo transshipment complexes have been designed
OF which:
Constructed
Under constucted
Prospective
17
15
1
1
Container terminals
St-Petersburg sea port.
First container terminal
PD,
DDD,
DS
Constructed
in 1999–2007
37
OJSC «St-Petersburg sea port»,
CJSC «Pervy kontainerniy terminal»
Development and modernization of technologies and equipment, reconstruction of pavement and engineering utilities
1,0 million TEU or
12,0 million tons
FSUE «Rosmorport»,
LLC «Baltyskaya stividornaya compania»
Container terminal in the scope of ferry complex in Baltysk, Kaliningrad region
Quays 1, 2 — pavement
38
PD,
DDD,
DS
1 Stage constructed
in 2006,
1 phase constructed
in 2011
0,2 million TEU or
2,4 million tons
Ust-Luga Commercial Seaport. Ust-Luga Container terminal
PD,
DDD,
DS
1 Stage
constructed
in 2011
39
CJSC (OJSC) «Ust-Luzhsky kontainerniy terminal»
Offshore and onshore facilities of the complex
0.4 million TEU
or 5,2 million tons
40
CJSC (OJSC) «Ust-Luzhsky kontainerny terminal»
Ust-Luga Commercial Seaport. Ust-Luga Container terminal
Offshore and onshore facilities of the complex
PD,
DDD,
DS
2–4 Phases are under construction since 2011
2,56 million TEU or
30,7 million tons
St-Petersburg seaport.
Petersburg container terminal
DOI,
PD,
DDD
Under construction
since 2013
41
CJSC «Pervy kontainerniy terminal»
Quay No. 88 — area expansion
0,6 million TEU
or 7,2 million tons
LLC «Fenix»
St-Petersburg sea port. Marine cargo district Bronka. Compound container terminal
Offshore and onshore facilities of the complex
42
DOI,
PD,
DDD,
DS
1 Stage constructed
in 2015
2 Stage constructed in 2016
1 Stage – 0,5 million TEU or 6,0 million tons.
Full development: 1,45 million TEU
or17,0 million tons and 130 thousand cargo units
Total:
20 million tons
St-Petersburg seaport. Container terminal in Lomonosov
PD
According to Client’s plans
43
CJSC «Yantar»,
CJSC «Lomonosovsky gruzovoy terminal»
Offshore and onshore facilities of the complex
1 million TEU
or 12,0 million tons
44
CJSC «BSK»
Container terminal in the area of quays No 1, 2 of ferry complex in Baltysk, Kaliningrad region
Reconstruction of Quay No. 2. Area expansion. Onshore facilities
PD
1-5 Stages constructed
in 2016
6 Stage under construction since 2016
Increase from 0,2 to 0,4 million TEU
or from 2 to 4 mil-lion tons
45
Container terminal in the scope of Multipurpose transshipment complex «Yug-2»
DOI,
PD,
DDD,
DS
1 Phase constructed in 2008;
2 constructed in 2010
OJSC «Kompania Ust-Luga»
Berthing and onshore complex facilities. The second stage of construction.
0,12 million TEU
or 1,4 million tons
46
OJSC «Kompania Ust-Luga»
Container terminal in the scope of Multipurpose transshipment complex «Yug-2»
Berthing and onshore facilities of the complex. The third phase of construction
DOI,
PD,
DDD
According to Client’s plans
4,09 million tons
47
St-Petersburg seaport. Transporta-tion logistics center in the area of Bronka –Lomonosov
DOI
According to Client’s plans
OJSC «Nacionalnay Refrizheratornaya Compania»
Offshore and onshore complex facilities.
18,0, including
1 million TEU
48
CJSC «Container terminal Saint-Petersburg»
Site No. 4 on the territory of CJSC «Saint-Petersburg Container terminal»
Logistics and warehouse facilities
DDD,
DS
1 Stage constructed
in 2015
0,23 million TEU
or 2,7 million tons
Total:
Container terminals have been designed
Of which:
Constructed
Under constructed
Prospective
13
7
3
3
№
п/п
Object
Client
Design stage
Facilities
Status ofconstruction/operation
Design cargo turnover, million tons/year
Passenger turnoverr, million passanger/year
Technical indices
Ferry and passenger complexes
49
SI MPA Kaliningrad
Cargo-and-passenger ferry terminal in the basin No. 3, Baltysk, Kaliningrad region
FS,
DDD,
DS
Constructed
in 2003
4160 units а/tr
or 0,1 million t
Quays.No. 1, 2. Onshore facilities
0,017
CJSC «Baltyskiye transportnie sistemy»
50
St-Petersburg seaport
Compound terminal for rolling cargo and containers at the quay No. 101
DDD,
DS
Constructed
in 2003
—
0,7
51
FSUE «Rosmorport»
Automobile and railway ferry complex in Ust-Luga commercial seaport
FS,
DDD,
DS
Constructed
in 2006
5,5
Complex of hydrotech-nical and onshore facilities
—
FSUE «Rosmorport»
52
Automobile and railway ferry complex in the basin No. 4, Baltiysk
Complex of hydrotechnical and onshore facilities
FS,
DDD,
DS
Constructed
in 2006
—
0,8
53
LLC «Morskoy Fasad Sankt-Peterburg»
Marine passenger terminal on Vasilievsky Island
FS
Constructed
in 2010
718000 units а/tr or 14,4 million tons
Complex of hydro-technical facilities,
onshore buildings and facilities
4,0
CJSC «River port «Marine facade»
54
Marine passenger terminal on Vasilievsky Island
The complex of hydroengineering and onshore facilities
PD
According to Client’s plans
1,5
—
55
CJSC «Institut «Stroyproject»
Bridge crossing the river Neva in the area No. 2 of the first stage of St-Petersburg Ring Motorway
FS,
DDD
Constructed
in 2003
—
Quay for river passenger ships and ice protecting dam
0,1
Total:
Ferry and passenger complexes have been designed
Of which:
Constructed
Under constructed
Prospective
7
6
—
1
Design stage*
Status of construction / operation
Technical indices
Dredging volume million m3
Facilities
Dredging works for approach channels and navigational basins
St-Petersburg seaport. Petersburg oil terminal
DDD,
DS
Constructed
in 2003
7,4
56
MPA of St-Petersburg
Dredging works in the opera-tional waters of the terminal
FSUE «Rosmorport»
Reconstruction of St-Petersburg sea channel
57
Dredging works at navigable passage and the waters of Petersburg oil terminal and Baltic bulker terminal
DOI,
DDD,
DS
Constructed
in 2003
0,2
Vysotsk port. Distributing and transshipment oil products complex LUKOIL - II
PD,
DS
Constructed
in 2005
58
OJSC «RPK Vysotsk «LUKOIL II»
Dredging works at navigable passage and terminal waters
1,3
OJSC «Petrolesport»
St-Petersburg seaport. Barochny basin waters
59
Dredging works at navigable passage and waters
PD,
DS
Constructed
in 2005
0,9
Marine passenger terminal on Vasilievsky Island
60
FSUE «Rosmorport»
Dredging works at navigable passage and terminal waters
FS,
DDD,
DS
Constructed
in 2008
22,5
FSUE «Rosmorport»
Automobile and railway ferry complex in Ust-Luga commercial seaport
61
Dredging works at operational waters of the complex
FS,
DDD,
DS
Constructed
in 2006
4,0
Automobile and railway ferry complex in the basin No. 4, Baltiysk
62
FSUE «Rosmorport»
Dredging works at navigable passage and waters
FS,
DDD,
DS
Constructed
in 2006
0,2
LLC «PSA Perspektiva»
Marine passenger terminal on Vasilievsky Island
63
Dredging works from processing channel to construction quality
DDD,
DS
Constructed
in 2005
0,2
Handling district «Ekonomia». Arkhangelsk oil terminal
64
LLC «NK Rosneft NTC»
Dredging works at navigable passage and waters
PD,
DS
Constructed
in 2008
1,9
OJSC «Compania Ust-Luga»
Ust-Luga commercial seaport. Multipurpose transshipment terminal «Yug-2»
65
Dredging works at the operational waters
PD,
DS
Constructed
in 2011
3,4
Ust-Luga commercial seaport. Ust-Luga container terminal
66
FSUE «Rosmorport»
Dredging works at operational waters of the first start-up complex
PD,
DDD,
DS
Constructed
in 2009
4,0
FSUE «Rosmorport»
Ust-Luga commercial seaport
LPG transshipment terminal
67
Dredging works at operational waters of the first start-up complex
PD,
DDD,
DS
Constructed
in 2013
1,4
Ust-Luga commercial seaport. Reconstruction of the southern approach channel
68
FSUE «Rosmorport»
Dredging works at navigable passage and turning basin
PD,
DDD,
DS
Constructed
in 2009
7,3
FSUE «Rosmorport»
St-Petersburg marine channel. Approach channel and waters of MMTC «Bronka»
69
Dredging works at operational waters
PD,
DDD,
DS
1 Stage
constructed
in 2015
2 Stage Constructed
in 2016
18,7
10,6
Ust-Luga commercial seaport. Ust-Luga container terminal
70
FSUE «Rosmorport»
PD,
DDD,
DS
Stage 1, 2 ― Constructed in
2013
Dredging works at operational waters of the 2, 3, 4 start-up complexes
Stage 3, 4 ― according to client's plan.
2,4
5,4
FSUE «Rosmorport»
Ust-Luga commercial seaport. The northern approach channel
71
Dredging works at the northern approach channel
PD,
DDD,
DS
Constructed
in 2011
7,0
Ust-Luga commercial seaport. Service fleet harbour
72
FSUE «Rosmorport»
Dredging works at operational waters
PD,
DDD,
DS
Under construction
sine 2011
2,9
CJSC «LGT», Firm «HOHTIF Aktsiengezelshaft»
Lomonosovsky cargo terminal
73
Dredging works at approach channel and operational waters of the terminal
PD
According to Client's plans
15,9
Ust-Luga commercial seaport. Big ship fairway
74
FSUE «Rosmorport»
Dredging works in the vicinity of Seskar Island
PD,
DDD,
DS
Constructed
in 2011
0,2
FSUE «Rosmorport»
Ust-Luga commercial seaport. The western approach channel
75
Dredging works on approach channel and operating waters of the terminal
PD,
DDD,
DS
Constructed
in 2011
1,3
Olya seaport in Astrakhan region
76
FSUE «Rosmorport»
PD
Constructed
in 2010
Dredging works at operational waters of rolling and general cargo transshipment complex
0,1
Boskalis BV
77
St-Petersburg sea port. New section of approach channel to the navigable passage С-1
Dredging works at the area from the entrance buoy to picket PK-352
DDD
Constructed
in 2008
8,3
78
LLC «Ratibor»
St-Petersburg sea port. Re-construction of the northern Kronshtad channel
Dredging works at navigable channel
DDD
Constructed
in 2009
0,1
FSUE «Rosmorport»
St-Petersburg commercial seaport
79
Reconstruction of St-Petersburg sea channel. General plan of dredging works
IS
Constructed in 2012–2016
38,3
St-Petersburg commercial seaport
80
FSUE «Rosmorport»
Reconstruction of
St-Petersburg sea channel
PD,
DS
Stage 1.1 ― constructed in 2013
Stage 1.2, 1.3 under construction 2016
0,4
2,2
FSI «Directorate of State Contracting Authority for Marine Transport Development Programes»
81
Deep-water port in Baltiysk, Kaliningrad region (Hub)
Dredging works at approach channel and port waters
IS
According to Client’s plans
102,2
82
Ust-Luga commercial seaport
OJSC «Compania Ust-Luga»
General plan of dredging works at approach channels and waters
Plot plan scheme
of the port
Beginning
of construction
2008–2025
58,0
83
JSC «Yamal LNG»
Seaport near Sabetta settlement on the Yamal Peninsula, including creation of a navigable approach channel in the Gulf of Ob
Objects of the preparatory period. Approach channel and water area
DOI,
PD,
DDD,
DS
Constructed
in 2015
13,0
Seaport Big port of St. Petersburg
84
FSUE «Rosmorport»
Construction of berthing complex for holding of ice-breaking fleet in Saint-Petersburg seaport
PD,
DD
Constructed
in 2015
0,2
85
LLC «Gazprom proektirovanie»
LLC «NIPI NG «Peton»
Leningrad region, the vicinity of the compressor station «Portovaya»
Dredging works in the waters
PD,
DDD,
DS
Under construction
2017
0,4
Total:
Dredging works for approach channels and navigational basins have been developed
Of which:
Constructed
Under construction
Prospective
32
26
3
3
Client
Object
№
п/п
Facilities
Design stage*
Status of construction /operation
Objects and facilities of seaport infrastructure
FSUE «Rosmorport»,
LLC «Baltyskaya dnouglubitelnaya kompania»
Marine passenger terminal on Vasilievsky Island, St-Petersburg (Marine Facade)
86
Navigational beacons on hydrotechnical foundation of approach channel
PD,
DDD,
DS
Constructed
in 2008
Marine passenger terminal on Vasilievsky Island, St-Petersburg (Marine Facade)
87
FSUE «Rosmorport»,
LLC «Baltyskaya dnouglubitelnaya kompania»
Navigational beacons on hydrotechnical foundation of Petrovsky channel
PD,
DDD,
DS
Constructed
in 2007
88
Boskalis BV,
FFE «Directorate of KZS Rosstroy»
Approach area of Kronshtad ship channel in navigable passage С-1
Rear navigational beacon RNB – 2: 45 m height on hydrotechnical foundation
DDD,
DS
Constructed
in 2008
Ust-Luga Commercial Seaport
PD,
DDD,
DS
Under construction since 2011
89
FSUE «Rosmorport»
Service fleet base
FSUE «Rosmorport»
Ust-Luga Commercial Seaport
Navigational beacons on hydrotechnical foundation of the southern approach channel «Luga approaching leading line»
90
PD
Constructed
in 2010
Ust-Luga Commercial Seaport
PD
According to Client’s plans
91
FSUE «Rosmorport»
Navigational beacons on hydrotechnical foundation of northern approach channel
FSUE «Rosmorport»
Ust-Luga Commercial Seaport
Linear navigational range «Luga Marine Western»
92
PD
Constructed
in 2012
Ust-Luga Commercial Seaport
PD,
DDD,
DS
Constructed
in 2010
93
FSUE «Rosmorport»
Reconstruction of navigational safety system at outer marine approaches, I stage
FSUE «Rosmorport»
Ust-Luga Commercial Seaport
Reconstruction of navigational safety system at external marine approaches , II stage (Luga western channel. Luga western fairway)
94
PD,
DDD,
DS
Constructed
in 2011
Big port of St-Petersburg
PD,
DDD,
DS
Constructed
in 2015
95
FSUE «Rosmorport»
Construction of berthing complex for icebreakers moorage in St-Petersburg sea port
FSUE «Rosmorport»
96
Ust-Luga Commercial Seaport
1 Stage Constructed
in 2014
2 Stage - under constructed 2014
Port protecting facility of the southern basin area
PD,
DDD,
DS
97
JSC «Yamal LNG»,
LLC «MRTS Engineering»
Seaport near the settlement of Sabetta on the Yamal Peninsula. The main objects of the sea port
DOI,
PD,
DDD,
DS
Constructed
in 2016
Artificial land. The south - eastern icebarrier facilities
FSUE «Rosmorport»
98
Saint-Petersburg Seaport. Marine cargo district Bronka
Linear range of «Bronka-2»
PD,
DDD,
DS
Constructed
in 2015
99
FSUE «Rosmorport»
Saint-Petersburg Seaport. Marine cargo district Bronka
PD,
DDD,
DS
Constructed
in 2015
Linear range of «Bronka-3»
100
LLC «Gazprominvest»
Storage and regasification LNG terminal in Kaliningrad region
IS,
DOI,
DDD,
DS
Under construction since 2016
Protective structure
JSC «Yamal LNG»
OJSC «MRTS»
Seaport near the settlement of Sabetta on the Yamal Peninsula. Main facilities of the seaport.
101
Root part of the south – eastern icebarrier facilities
DOI,
PD,
DDD,
DS
Constructed
in 2016
102
LLC «Gazprom proektirovanie»
LLC «NIPI NG PETON»
Leningrad region, the vicinity of the compressor station «Portovaya»
DDD,
PD,
DS
Under construction since 2017
Protective structure, port fleet base
Total:
Objects and facilities of seaport infrastructure have been designed
18
Of which:
Constructed
13
Under construction
4
Under design
1
* Legend Design stages:
IS — Investment Substantiation
C — Concept;
DOI— Declaration of Intentions;
FEED — Front end engineering design;
FS (project) — Feasibility Study (project);
PD — Project Documentation;
DDD — Detailed Design Documentation;
DS — Design Supervision.
Total | Cargo turnover of design projects | Dredging | |||||
No. | Reloading complexes for oil, gas and oil products (million tons) | Reloading complexes for general, bulk and universal cargo (million tons) | Container terminals (million tons) | Ferry and passenger complexes (million tons) | Total cargo turnover (million tons) | Dredging on approach channels and navigational basins (million m³) | |
1 | Constructed | 94,5 | 29,5 | 29,7 | 21,5 | 175,2 | 106,6 |
2 | Under construction | - | 21,1 | 58,0 | - | 79,1 | 21,1 |
3 | Under design | - | - | - | - | - | 142,2 |
4 | Prospective | 135,5 | 2,3 | 30,0 | - | 167,8 | 118,1 |
Activities
Front end engineering design (FEED)
Business planning
Engineering surveys
Desing
Desinger supervision
Certification of hydrotechnical facilities